gtalum wrote:You're making fantastic progress, Frank. I'm impressed.
Thanks cag and gtalum... support from the board has been wonderful... putting in 12-16 hours days doesn't hurt either... I've been off work for the past week and probably won't return till either Jan 2 or 9 depending on what I have left to complete...
I just took a wonderful jacuzzi bath followed by a long HOT shower... I bet I was in the bathroom for an hour... the six foot shower and jacuzzi is about half the size of the FEMA trailer... it was sooooooo nice to be in my house taking that first shower...
Wife is washing clothes in the house tonight as well... finished all the crown molding in the entire house.. two piece mold set.... looks really nice, will post some pixs when its painted... my nephew came and finished up most of it the past two days as I was busy hooking up the showers and plumbing for the washer and dryer... should be installing at least one toilet on Sunday or Christmas day... now that would be a nice present... a full size commode to have available after that big Christmas day meal.. hehe
all that's left on the inside that I have to do is finish up the painting, hang the doors, install railing on the porches, and put the base board up... I still have contractors on schedule to install granite, hang the plethora of light fixture we have, install the oak flooring and ceramic tile my front porch... but tonight was a major milestone...